Scroll down to load more.
Load more
Scroll down to load more.
Load more
We have new mould of EI 190.5 sizes. It is mono-phase EI Lamination for transformers.
Ningbo Hongqi Electrical Accessories Co., Ltd., a trusted manufacturer of electrical plastic components, has upgraded its precision plastic mould production line to deliver high-quality plastic housin
Choose the brush holder body resin by the measured hot-spot temperature of the motor, not by the resin's datasheet heat-deflection number. Those two numbers are routinely 20-40 C apart, and the gap is
A Chinese kettle factory will typically quote from 1,000 units on an existing body, 3,000 units on a new colour or finish, and 5,000+ when a new mould is required — and that ladder is not arbitrary. E
Plan 14–16 weeks for a first custom kettle with a new mould, and 7–9 weeks if you build on an existing body — that is the difference between tooling and no tooling. Everything else on the schedule mov
A weld line is a 2–10 µm V-groove, which is why nobody sees it on the bare part and everybody sees it after coating. The coating does not fill a groove — it deposits conformally, 20–40 µm thick, repro
Product Inquiry